Somebody asked me today what the link was between Knowledge Management and Continuous Improvement. I think the answer lies in the diagram shown here.
Diagram from a paper I co-authored for the Society of Petroleum Engineers "Implementing a Framework for Knowledge Management" |
Knowledge Management (KM) is an attitude and discipline for organisational learning. The KM cycle is sometimes expressed as "learn before, during and after"
KM and CI intersect at the Learn step, as shown in the diagram.
The link here between KM and CI emphasises three things.
- Learning comes after doing. You need experience from which to learn, and that needs to be either your Doing, or someone else's.
- Learning comes after measurement. It is through measurement (of whatever indicators you use to determine success) that you know whether the Doing was successful, and you know what needs to be improved or repeated in future.
- Learning comes before planning. Although the Deming cycle is usually described as "Plan-Do-Measure-Learn", it can equally well be described as "Learn-Plan-Do-Measure". Start with the Learn, and Learn before you Plan before you Do.